Following the successful delivery of their ECO-TAC cooling water modules to GE for the Waad Al Shamal project, Ecodyne has been selected to deliver similar modules to Taiwan.
Client | General Electric |
Location(s): | Taiwan PC |
Capacity: | 480 MW |
Plant: | 2 x GE 7FA gas turbines |
Order: | 2016/Q4 |
Hardware: | ECO-TAC Air Cooled Heat Exchangers for generator cooling and lubrication oil cooling with steel structure, handrail and ladders, pump-skid, interconnecting piping and instrumentation. |
Services: | After successfully delivering ECO-TAC cooling water modules to GE for the their Waad Al Shamal project, Ecodyne has been selected to deliver similar modules to Taiwan. |
Website: | Link to external site |
By: | Trent Crawford |